The old boilers at Hope UMC were removed in early September and replaced with two new high-efficiency units installed by McDonald Miller Co. McDonald Miller Co. also installed two new chimney vents and replaced the primary circulation pump. A preliminary light-off on Sept. 25 highlighted needed adjustments. Final inspection is scheduled for Oct. 1.
The team excavated the parking lot drain at the southwest corner and replaced old, root-bound pipes with new PVC.
James King Roofing completed annual roof maintenance. Crews cleaned out gutters and 20 downspouts, removed blocking debris from eight roof drains, completed 21 flashing and curb repairs, and addressed two areas where the roof is wearing out.
The state Department of Labor and Industries resolved a software issue and issued the elevator permit, which had been due in January.
We submitted a rebate application for improved boiler energy efficiency to PSE, and it will likely be granted for $10,000. We have held preliminary meetings with PSE to explore electrical energy-efficiency improvements, including LED conversion, smart lighting, and rooftop solar panels.